The European Commission has
proposed a new energy package that can result in significantly lower
growth of the EU gas imports.
Any reduction of gas
consumption in the EU will result in lower imports from Russia.
South Stream and Nord
Stream-2 were conceived as bypass projects without increasing export
volumes of Russian gas. These projects are too risky under the new
market conditions.
If the EU fulfills just 25%
of its goals, the first line of the Nord Stream project will not be
needed.
Nord Stream and South Stream
projects require the construction of new feeding pipelines from Shtokman
and Yamal.
The
transit cost of gas via Ukraine and Belarus is
lower than the transmission cost of
Nord Stream and South Stream (with feeding lines).
Presentation
with charts and tables is available
in
PowerPoint show
(700 KB) and in
PDF format (400 KB).
Mikhail Korchemkin
November 25,
2008
|
Европейская комиссия
предложила пакет мер, которые могут привести к значительному снижению темпов
роста импорта газа странами ЕС.
Любое сокращение
потребления газа в ЕС отразится на объемах импорта из России.
"Южный поток" и
вторая ветка Nord Stream были
задуманы как обходные газопроводы, не предназначенные для увеличения экспорта
российского газа. В новых условиях эти проекты стали слишком рискованными.
Первая ветка
Nord Stream станет ненужной, если ЕС
выполнит свой план хотя бы на 25%.
Nord Stream
и "Южный поток" требуют строительства новых подводящих
газопроводов от месторождений Ямала и Штокмана.
Затраты на
украинский, белорусский и польский транзит ниже, чем стоимость транспортировки
газа по новым экспортным маршрутам Газпрома (с
учетом подводящих газопроводов).
Презентация
представлена в виде
PowerPoint Show (700 KB)
и в
формате PDF (400 KB).
Михаил Корчемкин
25 ноября 2008 г.
|